Recent Projects

Please browse through our featured projects archive to see the capabilities of MAGNUM Industrial Services over the years. We believe that these galleries accurately illustrate the scope of work that is often requested by our varied clients.

August 2018 Annacis Waste Water Treatment Plant

Offload and place 2 new Cummins backup Diesel generators. Approximate weight 165000 lbs. Tandem lifted with 2 Liebherr 270 ton hydraulic cranes. Project included seismic restraint and final site assembly.

 

July 2018 Annacis Waste Water Treatment Plant

Offload and jack and roll 4 new Caterpillar generators weighing approximately 56000lbs. Project included final placement of units on housekeeping pads and installation of vibration isolators.

 

Annacis Wastewater Treatment Plant | Delta, BC

Standby Generator 1 Annacis Waste Water treatment Plant. 20 wide X 60 long X 16 high. 148000 lbs transport weight. Triton Transport roaded 2 Super Loads from Alumtech to Annacis Island. – 270 ton cranes from Kansen Crane Service for offload and placement.Magnum will complete the seismic restraint, installation of the catwalks,stairwells and related equipment.

 

Royal Columbian Hospital | New Westminster, BC

New boilers being installed at the Royal Columbian Hospital expansion. 3 new Cleaver Brooks 21000 lbs and 2 new Viessmann 15000 lbs.

 

Burnaby General Hospital | Burnaby, BC

MAGNUM rolled this 12,000 lb boiler into mechanical room at Burnaby General Hospital and lowered it down to lower level for final placement.

 

Harbour Centre Escalator Replacement | Vancouver, BC

MAGNUM was contracted to remove 2 escalator trusses as part of a demolition and upgrade project in the main entrance of Harbour Centre.

 

Children’s Hospital | Vancouver, BC

MAGNUM recently completed a large project at the new Hospital which entailed live rigging 50 large air handling units using onsite tower crane thru a wall opening on level 5. These units were then rolled to different locations thru out the building where they jacked onto pads for final assembly. Additionally 4 large 24,000 lb roof top chillers were hoisted to the roof with a 270 ton crane and then had to be rolled across the building and jacked up and slid onto 4 foot curbs.

 

Langara College | Vancouver, BC

MAGNUM completed this project in 2015 at Langara College where a 500 ton crane was utilized to hoist sections of a large mechanical building. Due to the access MAGNUM’s crews required the 500 ton to place the sections over 200′ from the roof edge with the heaviest weighing 36,000 pounds. Once the units were in place our crews completed assembly of the structure.

 

Harbour Centre Escalator Replacement | Vancouver, BC

MAGNUM was contracted to remove 2 escalator trusses as part of a demolition and upgrade project in the main entrance of Harbour Centre.

 

Vancouver Community College | Vancouver, BC

A major renovation was undertaken with the removal and replacement of the existing Chillers, pump systems, piping and cooling towers. This project was done in different phases in early 2013.

 

Surrey Memorial Hospital Chiller Upgrade | Surrey, BC

MAGNUM was contracted to remove two existing chillers and replace them with two larger capacity units as part of a maintenance upgrade. This project required extensive surface shoring on the outer landing and a 120 tonne mobile crane to complete the hoisting.

This required considerable coordination with the Facilities Management Team of Surrey Memorial Hospital due to restricted access and on going construction.

 

Surrey Memorial Hospital Boiler Replacement | Surrey, BC

Surrey Memorial Hospital upgraded their Boiler system due to a large expansion project at the facility.

Two new Cleaver-Brooks Boilers weighing 65,000 lbs. were off loaded by crane and rolled into the Boiler house. At that time the accumulators and blower systems were raised and attached to the Boilers.

 

TELUS Shelter Relocation Project | Coquitlam, BC

An existing built in place shelter had to be relocated due to a new Hydro tower upgrade.

The process involved saw cutting the foundation, placing a trailer under the structure and using two large capacity folding boom cranes for the final placement in its new location.