Past Projects

November 2017 Bentall Centre Vancouver

Replacement of Air Handling coils. Equipment was transferred from the hydraulic crane through an upper floor wall opening.

 

July 2017 Port of Vancouver

An onboard power generator failed while loading in the Port of Vancouver and emergency repairs were required. The stator had to be removed and sent to shore for repairs. This required disassembly and relocation of the stator from the engine room and relocation through various levels of the ship during removal and installation.

 

Planter Installations | Vancouver, BC

A total of 8 concrete planters weighing 1000 lbs. had to be lifted over the glass railing and placed on the outer edge of this building in downtown Vancouver. A portable scaffold system was assembled on the rooftop and used to complete this project.

 

Generator Replacements | Masset, BC

MAGNUM Industrial Services was contracted to assist in the removal and replacement of 3 new motor generators for BC Hydro in Masset, Queen Charlotte Islands. This project was done in 2 phases with the removal of the 3 existing units done in July and installation of the new units completed in August of 2009.

The units were brought by lowbed to Prince Rupert and barged to Masset. A 165 ton hydraulic crane was also brought to complete the hoisting. The new generators were offloaded and the old units loaded in less than 24 hrs.

 

Escalator Assemblies | Vancouver, BC

MAGNUM was asked to assist with the installation of 2 escalator assemblies for a customer in downtown Vancouver in May 2012. A narrow entrance into the building and limited space presented a challenge at this location.